What residents told this project they want first
Marin City Urban Wetland Community Visioning Project
Makes room for water
Turn the silted pond behind the culvert into a wetland, with a park around it. A design and planning project so far, not construction.
- When
- No dates published
- Cost
- Planning funded; no construction figure published

Pros and cons, by where you stand
| Where you stand | For | Against |
|---|---|---|
| You live on the flat | Turning the silted basin back into open water and marsh gives the bowl back room it has lost, so in our model water behind the gate has somewhere to go before your corner. | It does not touch the gate. When the bay is up, a wetland fills the way the pond does, and the proponents' own figures put flood reduction at a small share of the benefit. |
| You live up the hill | It pairs with the People's Plan idea of holding silt on the hill. Less mud coming down keeps the basin from refilling. | Nothing in it is for the hill streets. Water standing on Cole Drive or in the courts is not this project's subject. |
| You drive in and out | In the model's larger storms, lower peak levels at the pond mean the Donahue corner and the underpass go under a little later and drain sooner. | It is a planning project. No design or date has been published, so it changes nothing about the road until something is built. |
| You work or shop at the Gateway | A park and a path on the lot's edge bring people to the center's door, and the lot's runoff would drain through planted wetland edges instead of straight into a silted basin. | The pond is private ground beside the lot. Any change there needs the owner, and the lot itself is not in the plan. |
| You want the pond to be a place | The one funded plan that treats the pond as a place: 1.6 acres of wetland, a walking path, viewing piers, and more of the marsh the herons already use. | Whether a pump station and a floodwall can share three acres with a marsh is not settled, and the county is designing both for the same corner. |
| You want Marin City deciding for itself | Led by residents, its own fact sheet says, with Shore Up Marin City at the table, and the plan residents have told us they want first. | The planning money came from outside funders, no construction money has been published, and who leads it depends on who is describing it. |
| You want something done this winter | The planning money is already in hand, so the design can move without waiting on a new grant. | No dates, design or construction money have been published, so nothing on the ground is likely to change this winter, and probably not next. |
| It is your money, or it is not | Funded so far by outside restoration money. Residents have not been asked to pay. | No construction figure has been published, so nobody can yet say what building it would cost or who pays for it. |
Read more: the full description, where residents stand, and this project's reading
Turn the Marin City Pond, the three-acre detention basin behind the culvert, into wetland and open-water habitat, with public access and a park, through a community-driven design process. Who leads it depends on who is describing it. The funder lists Audubon California as lead and Shore Up Marin City as partner. The groups' own 2021 fact sheet, saved on this site, says the project is led by residents of Marin City, with Shore Up Marin City partnering with Audubon California. That fact sheet, the fullest description this project has read, calls the work a restoration and says the basin was historically a tidal wetland. It proposes 1.6 acres of wetland habitat around the basin's edge, with a park beside it: a walking path, viewing piers and exercise stations.
Where residents stand: for
Restoring the pond as a wetland is what residents have told this project they want first — ahead of a pump, a wall or a second pipe.
Told to this project by residents, September 2026. The pond's restoration was raised at a Community Services District meeting that month, and residents say it has been reported as a concern at Board of Supervisors meetings. The 2021 fact sheet describes the project as led by residents of Marin City, but ranks nothing. [TODO: project team to name the meeting, letter or statement in which residents ranked the restoration first.]
This project's reading
In the model this is the storage switch, and the one the county's own documents already half-describe: the stormwater plan calls the pond “a three-acre tidal marsh habitat” that “functions as a tidal wetland”. The federal money reported for digging out its silt is aimed at the same three acres. A dredged basin with planted edges gives the bowl back the room it has lost to silt. On its own it does not change the gate. With the bay above the culvert floor, a wetland fills the way a pond does — and the proponents do not claim otherwise. Their own fact sheet values the project at $137,837 a year, $3,126 of it flood reduction, and presents the wetland as complementing the county's outfall and tide-gate work, not replacing it. The open question is whether a pump station and floodwall can share the three acres with a restored marsh; the county's pump-station environmental document is where that would be answered. The People's Plan put dredging and enhancing the basin, and making it a place, third of its six projects in 2018.
Sources
- Marin City Urban Wetland Revitalization Project fact sheet — Earth Economics, with Shore Up Marin City and Audubon California, 2021 (PDF, 4 pages, read in full; saved copy) ↗Written by the project's proponents. Supplied to this project by the project team; the address it was published at has not been located, so the link is the copy saved on this site.
- Marin City Urban Wetland Community Visioning Project — San Francisco Bay Restoration Authority ↗The funder's project page. Seen as a search result, not opened from where this site is built.
- Marin City Pond Flood Reduction Project — Flood Control District, on working with the restoration's leads ↗The District describing the relationship from its side. Seen as a search result, not opened from where this site is built.
- The People's Plan (2018), project 3: detention basin and parking lot retrofit (PDF, read in full) ↗